logo

Projects

Mullingar Regional Hospital

FDAS & EL Upgrade to Mullingar Regional Hospital

FCC provide professional support services with the design and build concepts for the upgrade of the existing addressable FDAS constituting new control panels, new and additional hardware devices to provide L1 coverage and complete new wiring in a closed steel containment system design, as per IS 3218:2013 & HTM 05-03 throughout Mullingar Regional Hospital. It also included the provision of a new addressable emergency lighting installation (in a closed steel containment system) and exit signposting to an environmentally friendly system that is LED (light emitting diodes) technology and be a fully intelligent addressable system with emergency lighting control panels installed throughout the hospital as per IS 3217:2013.

Client:

HSE

Year:

2017 - 2019

Scroll to Top